Eldan Recycling A/S Page 3
IMPORTANT:
Before the system is started up, the power and control supply
voltages must be checked by qualified personnel in order to
prevent damage to electrical equipment.
Before start-up, check that no one is present around rotating
parts.
When stopping the system, check that all rotating parts have
stopped and that the end of the outlet pipe has cooled down
before starting work on the system. Following this procedure
will eliminate the risk of personal injury.
The main switch (H1) must always be switched off and locked
before service or repair work is commenced.
INSTALLATION
Installation of cables. Installed at the bottom of the panel only
(see layout drawing).