EasyManua.ls Logo

EMC Data Domain DS60

EMC Data Domain DS60
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
b. Insert the free end of the securing strap into the slot on the ratchet
mechanism. Pull the ratchet handle down to tighten the securing strap
around the lift and the shelf.
Figure 31 Tightening the straps
1 2
CL5429
c. Make sure the shelf is securely strapped to the lift before moving. Use the
cordless drill to raise the arm to lift the node from the support table. Once
the shelf is supported by the arm, lower the arm to the lowest point that still
permits travel.
This allows the shelf to be moved with minimal danger of tipping over.
6. Unlock the casters by lifting up on the locking tabs and move the shelf as
required.
Figure 32
Unlocking the casters
CL5424
7. Move the shelf to the support table. Use the drill to raise or lower the shelf
above the support table. Move the shelf over the support table, and use the drill
to lower the shelf onto the table.
Shelf Installation and Removal
Using the lift on a shelf more than 49" above the floor 47

Table of Contents

Related product manuals