EasyManua.ls Logo

EMC Data Domain DS60

EMC Data Domain DS60
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 66 Nutbar installation (Left nutbar shown)
Note
The nutbars are not interchangeable. There is a distinct nutbar for the left and right
side. Use part numbers for identification.
Procedure
1. At the front of the rack, align and install the left nutbar (051-000-357) directly
above the rail assembly.
2. Secure the nutbar with two M5 securing screws, one above the top alignment
pin and one below the lower alignment pin.
3. Repeat the previous steps for the right nutbar (051-000-356).
Shelf Installation and Removal
Shelf rail installation in non-EMC racks 73

Table of Contents

Related product manuals