EasyManua.ls Logo

Endress+Hauser Liquicap M FMI51 HART - Post-Installation Checks

Endress+Hauser Liquicap M FMI51 HART
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Liquicap M FMI51 HART Mounting
Endress+Hauser 25
1
A0040477
1 Spring washer
4.7.2 Aligning the housing
The housing can be rotated 270 ° to align with the cable entry. To prevent moisture
penetration, route the connecting cable downwards in front of the cable gland and secure
it with a cable tie. This is particularly recommended for outdoor mounting.
Aligning the housing
1 → 2 → 3
A0042107 A0042108 A0042109
The clamping screw for aligning the housing type T13 is located in the electronics
compartment.
4.7.3 Sealing the probe housing
Make sure that the cover is sealed. Water cannot enter into the device when performing
installation, connection and configuration tasks. Always seal the housing cover and cable
entries securely.
The O-ring seal on the housing cover is shipped with a coat of special lubricant applied. In
this way, the cover can be sealed tight and the aluminum thread does not bite when
screwing down.
Never use mineral oil-based grease as this destroys the O-ring.
4.8 Post-installation check
After installing the measuring device, carry out the following checks:
Do a visual check for damages.
Does the device meet the specifications at the measuring point with regard to process
temperature and pressure, ambient temperature, measuring range?
Has the process connection been tightened with the tightening torque?
Check if the measuring points are correctly labeled.
Is the device adequately protected against precipitation and direct sunlight?

Table of Contents