EasyManua.ls Logo

Endress+Hauser Liquicap M FMI51 HART - Post-Connection Checks

Endress+Hauser Liquicap M FMI51 HART
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical connection Liquicap M FMI51 HART
30 Endress+Hauser
5.2.3 Connecting HART with other supply units
1
4
5
6
2
3
A0040750
 10 Remote control via HART protocol
1 PLC
2 Transmitter power supply unit e.g. RN221N with communication resistor
3 Connection output for Commubox FXA191, FXA195
4 Computer with control software (DeviceCare or FieldCare, AMS Device Manager, SIMATIC PDM)
5 Commubox FXA191 (RS232) or FXA195 (USB)
6 Transmitter
If the HART communication resistor is not integrated with the supply unit, a 250 Ω
communication resistor must be included in the 2-wire line.
5.3 Post-connection check
After wiring the measuring device, carry out the following checks:
Is the terminal assignment correct?
Is the cable gland sealed tight?
Is the housing cover fully screwed?
Is the device operational and is the green LED flashing when the device is on?

Table of Contents