MT100 Multipoint Flow Meter INSTALLATION
Installing Multiple Single Point Probes (MT100S)
Two or more single point probes provide multiple flow measurement points to an MT100S system. For best results install the probe so that
the centers of all sensor heads are located 14.6% of the pipe/stack inside diameter. Figure 18 below shows this and other key
measurements for multi-probe installation. Note that FCI’s AVAL program that is run at order time provides the required measurements as
a result of customer-entered parameters that define the instrument’s application. Refer to the AVAL information for site-specific
information.
Note:
The drawing below shows two different kinds of packing gland process connections, NPT and raised face flange. This
is done for illustrative purposes only. Normally, all sensor probes are of the same type process connection.
Figure 18 Multiple Single Point Probe Installation (Packing Gland Shown)
Fluid Components International LLC 21