84
OPERATION
18.7 Electronic power lift con-
trol / double action operation
(EPC/DA)
The EPC power lift can be switched to double-
acting (DA) mode.
DA mode is then operated directly with the
crossgate lever.
Operation_Pic_number:1
Switching from EPC to DA.
● Lower the lifting gear (if an implement is atta-
ched).
● Move crossgate lever into floating position
(see OPERATION Fig. 183).
● Move the selection lever to DW (DA).
Switching back from DA to EPC.
● Lower the lifting gear fully.
● Move crossgate lever to floating position.
● Move the selection lever to EPC (EHR).
● Unlocking the EPC (see OPERATION Sec-
tion 18.2).
DANGER:
Lower all implements mounted on
front and back.
Before switching to DA operation,
disconnect implements on 2nd rear
connector (blue) and multi-coupler.
Otherwise, undesired movements of
the implement, front loader and rear
power lift could occur.
When power lift is used for repair
work, e.g. changing tyres, the tractor
must be propped.
Fig.180
Function indicators in DA operation
Operation_Pic_number:1
Indicator (A) appears.
Operation_Pic_number:1
Indicator (A) appears.
Operation_Pic_number:1
Operating the power lift in DA mode.
A = Raise
B = Lowering or exerting pressure
C = Floating position
NOTE:
Use ground-working implements in 'floating
position' only.
Fig.181
Fig.182
Fig.183