85
OPERATION
18.8 Implement socket
Operation_Pic_number:1
From the implement socket (C) speed signals
are passed to the controlling devices, e.g.
sprayers, fertiliser spreaders.
Top view of implement socket
Operation_Pic_number:1
Designations are embossed.
1 = Radar signal - if equipped
2 = Transmission signal
3 = PTO shaft speed
4 = Fast lift switch
5 = Not in use
6 = +Battery voltage (+Ub)
7 = Ground
Fig.184
Fig.185
19. Three-point link
19.1 Lower links
Operation_Pic_number:1
Category II = 825 mm, III = 965 mm distance
between the lift support points (A).
NOTE:
Check ball/hook and bolts on the implement
side for wear and lubricate well.
Adjusting the lower control link di-
stance
Operation_Pic_number:1
Setting range: Category II - III.
DANGER:
Stay clear of the three-point link
when in operation - risk of crushing
or severing.
DANGER:
For lower link hook locking (see
OPERATION Fig. 189) never operate
or transport an implement unless
both hooks are securely locked.
Fig.186
Fig.187