Contents and general safety instructions
III
Festo Festo P .BE CP FB13-E-EN en 9910c
Contents
Designated use V........................................................
Target group VI..........................................................
Service VI...............................................................
Notesontheuseofthismanual VI...........................................
Important user instructions VII..............................................
1. Installation 1-1...................................................
1.1 General instructions 1-3.............................................
1.2 Setting the DIL switch elements 1-4...................................
1.2.1 Setting the field bus address 1-7......................................
1.3 Field bus baud rate and field bus length 1-10............................
1.3.1 Branch line length 1-11..............................................
1.4 Connecting the CP modules 1-12.......................................
1.5 Connecting the operating voltage 1-13..................................
1.6 Connecting the PROFIBUS DP interface 1-14.............................
1.6.1 Screening/shield connection 1-15......................................
1.6.2 Bus termination with terminating resistors 1-16..........................
1.6.3 Connection for optical-fibre waveguide 1-18.............................
2. Commissioning 2-1................................................
2.1 Preparing the CP system for operation on the PROFIBUS-DP 2-3............
2.1.1 Operating voltage 2-3...............................................
2.1.2 Saving the string assignment 2-3.....................................
2.1.3 Compiling the configuration list 2-4...................................
2.1.4 General information 2-5.............................................
2.2 Configuration with a Siemens master 2-13...............................
2.2.1 Preparations for COM PROFIBUS 3.x and 5.0 2-13.........................
2.2.2 Station selection with COM PROFIBUS 3.x 2-15...........................
2.2.3 Station selection with COM PROFIBUS 5.0 2-19...........................
2.2.4 Input and output address 2-23........................................
2.2.5 STEP 7 V4.x / 5.0 – Hardware configurator 2 -25..........................
2.2.6 Commissioning the CP system on the PROFIBUS-DP 2-35...................