Recommendation:
Providing the safety concept of your machine/system permits
this, commission the CP system with both operating voltages
(pins 1 and 2), but without compressed air. A suitable test
function is therefore available, which does not trigger unde-
sired reactions.
Please note
A CP valve location occupies two addresses. The following
assignment applies:
– lower-value address: pilot solenoid 14
– higher-value address: pilot solenoid 12