EasyManua.ls Logo

FLENDER H2SH 24 - Connecting a Speed Encoder; Connecting the Bearing Monitoring System; Connecting the Pt 100 Resistance Thermometer

Default Icon
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.5.7 Connecting the Pt 100 resistance thermometer
Procedure
To connect the Pt 100 resistance thermometer, proceed as follows:
1. Check that the Pt 100 resistance thermometer connection is not damaged.
2. Install the electrical wiring between the Pt 100 resistance thermometer and the evaluation
unit. The customer is responsible for providing the evaluation unit.
Further information
Further information about the Pt 100 resistance thermometer can be found in the Pt 100
resistance thermometer operating instructions in the complete documentation for the gear unit.
5.5.8 Connecting the bearing monitoring system
Procedure
To connect the bearing monitoring system to the gear unit, proceed as follows:
1. Make sure that the connections provided for holding the bearing monitoring equipment are
undamaged.
2. Install the bearing monitoring equipment at the customer's site.
Further information
Further information about the bearing monitoring system can be found in the operating
instructions for the bearing monitoring system components provided in the complete gear unit
documentation.
5.5.9 Connecting a speed encoder
Procedure
To connect the air-oil cooler to the gear unit, proceed as follows:
1. Ensure that the speed encoder connection is not damaged.
2. Electrically connect the speed encoder.
Further information
You can find additional information on the speed encoder in the speed encoder operating
instructions, provided in the complete gear unit documentation.
Assembly
5.5 Connecting components
Gear unit 5118en
Operating Instructions 10/2017 71

Table of Contents

Related product manuals