Commissioning
6
6.1 Measures prior to commissioning
Take the following measures before commissioning the gear unit:
● Read and observe the operating instructions.
● Replace the screw plug with the air filter or the wet-air filter. Read operating instructions
BA 7300 for further information.
● Fill the gear unit with oil.
● Gear unit with oil supply system: Check that the oil supply system is working properly.
● Check the oil level.
● Check the gear unit for leaks.
● Gear unit with oil supply system: Observe the appropriate measures prior to commissioning
gear units equipped with oil supply system.
● Ensure that all pipes and components are filled with oil.
Further information
Further information about oil and replacement of air filters can be found in the operating
instructions BA 7300 in the complete documentation for the gear unit.
Further information about individual components can be found in the operating instructions for
the components in the complete documentation for the gear unit.
6.1.1 Gear units with cooling coil
Implement the following measures before commissioning the gear unit with cooling coil:
● Make sure that the pressure in the cooling coil does not exceed the maximum permissible
pressure.
● Make sure that the temperature of the cooling coil does not exceed the maximum
permissible temperature.
Further information
Further information about the cooling coil can be found in the separate data sheet and the list
of equipment in the complete documentation for the gear unit.
Gear unit 5118en
Operating Instructions 10/2017 79