EasyManua.ls Logo

Framery 2Q - Page 160

Framery 2Q
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Framery 2Q Huddle
2. Install the light onto the back ceiling, edge to edge with the motion detector.
The light attaches to the ceiling with magnets.
Note: Make sure that the light and the motion detector are aligned. Use the
ceiling felt center line as the midpoint reference.
3. Connect the cord of the remaining light to the LED 1 connector of the control unit.
160
Installation instructions
info@frameryacoustics.com

Table of Contents

Related product manuals