EasyManua.ls Logo

Framery 2Q - Finalize the Installation of the Table and Electrics

Framery 2Q
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Framery 2Q Huddle
4. Install the light on the front ceiling, edge to edge with the motion detector.
The light attaches to the ceiling with magnets.
Note: Make sure that the lights and the motion detector are are aligned. Use
the ceiling felt center line as the midpoint reference.
14.12 Finalize the installation of the table and electrics
1. Move the table back against the side wall.
Installation instructions
info@frameryacoustics.com
161

Table of Contents

Related product manuals