EasyManua.ls Logo

Framery 2Q - Install Motion Detector and Lights

Framery 2Q
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Framery 2Q Huddle
14.10 Install the motion detector
1. Feed the motion detector DC cord to the control unit.
Note: Feed the cord to the same side of the ceiling beam as the control unit.
2. Connect the motion detector DC cord to the PIR connector of the control unit.
158
Installation instructions
info@frameryacoustics.com

Table of Contents

Related product manuals