EasyManua.ls Logo

Framery 2Q - Install the Control Panel Cord and the Ceiling Threshold

Framery 2Q
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Framery 2Q Huddle
12 Install the control panel cord and the ceiling threshold
If the delivery includes the booking system bracket, go to step 3.
1. Punch out the precut holes in the ceiling felt.
2. Guide the control panel cord from the U-profile on the strike plate-side glass frame to
the control unit and pull it out of the front opening in the ceiling.
Installation instructions
info@frameryacoustics.com
93

Table of Contents

Related product manuals