9. Pull the main power cord and one or two customer supplied LAN cords through the
hole in the back half of the floor.
Note: If you intend to install the power cord from the roof, leave it aside.
Note: Make sure that there is at least 3.8 m (12 ft 5 5/8 in) of the main power
cord inside the pod. You can pull the excess cord back outside the pod after the
installation.
10. Position the back half of the floor at the intended final location.