EasyManua.ls Logo

Framery 2Q - Page 49

Framery 2Q
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Framery 2Q Huddle
4. Install M8x55 bolts (3 pcs each side), M8 washers (3 pcs each side), and flanged M8
nuts (3 pcs each side). Tighten the bolts by hand.
Note: Press the acoustic panel aside to reach the bolt holes. Make sure that
you return the acoustic panel to its original position.
5. Install M8x55 bolts (6 pcs), M8 washers (6 pcs), and flanged M8 nuts (6 pcs) on the
roof. Tighten the bolts by hand.
Note: Install the two bolts located at the center of the roof modules from the
inside of the pod.
Note: Press the acoustic panel aside to reach the bolt holes. Make sure that
you return the acoustic panel to its original position.
Installation instructions
info@frameryacoustics.com
49

Table of Contents

Related product manuals