EasyManua.ls Logo

Fronius Calibration system 2.0 - Calibrating the Welding System

Fronius Calibration system 2.0
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
3
3
Connect the gas and data connec-
tions to each other
Calibrating the
welding system
IMPORTANT! Before starting the calibration process:
-
All devices to be calibrated must be connected to the calibration system:
power source, wirefeeder, shielding gas supply; etc.
-
The power source to be calibrated must be switched on at least 5 minutes
before the calibration process starts.
The calibration process is started from the calibration software on the com-
puter / laptop.
1
Start the calibration program
2
Click [New calibration]
The preliminary settings / contractor data are displayed.
3
Enter the details for a new contractor (= Person performing calibration):
-
Name
-
Address
-
Postcode
-
Calibration technician
4
Click on [Add]
or
select current contractor from the list shown
5
Enter the serial numbers of the measuring equipment:
-
Calibration system
-
Welding wire calibration system
-
Gas measurement system
6
Click [Next >]
The preliminary settings / customer data are displayed.
55
EN

Table of Contents