Appendix A. Measurement Considerations
Model PM880 Portable Hygrometer User’s Manual 175
Appendix A. Measurement Considerations
There are a variety of environmental and installation factors that can affect 
measurements. These factors should be discussed with a GE applications 
engineer or field sales person by the time you receive the PM880. However, 
if you decide to add additional measurement sites, this section contains 
some basic guidelines for selecting a measurement site and constructing a 
sample system. This section includes the following:
• Choosing a Measurement Site - see below
• Moisture/Temperature Probe Considerations - page A-176
•  Sample System Guidelines - page A-179
A.1 Choosing a Measurement Site
You should have discussed environmental and installation factors with a GE 
applications engineer or field sales person by the time you receive the 
PM880. The equipment should be suited to the application and installation 
site.
• Choose an installation site for the probes and sample systems that is as 
close to the process line as possible. Avoid long lengths of connecting 
tubing. If long distances are unavoidable, a fast sampling by-pass loop is 
recommended. Do not install any other components, such as filters, 
ahead of the probes or sample system unless instructed to do so by GE.
• Observe all normal safety precautions. Use the probes within their 
maximum pressure and temperature ratings.
• Locate the electronics unit away from high temperatures, strong 
electrical transients, mechanical vibrations, corrosive atmospheres, and 
any other conditions that could damage or interfere with the meter 
operation.