EasyManua.ls Logo

GE Venue Fit - Power On;Boot-Up; Warnings; Before Turning the System on for the First Time

GE Venue Fit
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DIRECTION 5854713-100, REVISION 2
VENUE FIT™ SERVICE MANUAL
Chapter 4 - General Procedures and Functional Checks 4-3
PRELIMINARY
4-2-2 Power ON/Boot-up
4-2-2-1 Warnings
NOTE: When turning on a system from standby mode, it takes a few seconds before it responds. Do not push
the On/off button again during this period. A second push will initiate a full shutdown.
NOTE: Before performing Power ON or system reboot, disconnect any USB mass storage device from the
system (unless a Software Installation procedure is required).
4-2-2-2 Before Turning the System ON for the First Time
1.) Open the battery switch silicon cover and switch ON the battery power.
2.) Remove the nylon sheet screen protector from the touch screen.
DANGER
ALWAYS CONNECT THE ULTRASOUND SYSTEM TO A FIXED POWER
SOCKET WHICH HAS THE PROTECTIVE GROUNDING CONNECTOR.
DANGER
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS
THE SAFETY GROUND.
DANGER
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT
THE POWER PLUG IS THE PROPER HOSPITAL-GRADE TYPE
(WHERE REQUIRED).
CAUTION
THE ULTRASOUND SYSTEM REQUIRES ALL COVERS.
OPERATE THIS UNIT ONLY WHEN ALL BOARD COVERS AND FRAME PANELS ARE SECURELY
IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION, GOOD SYSTEM
PERFORMANCE AND COOLING PURPOSES.
CAUTION
USE ONLY POWER SUPPLY CORDS, CABLES AND PLUGS PROVIDED BY OR DESIGNATED BY GE.
Figure 4-40 Battery Power Switch

Table of Contents

Related product manuals