DIRECTION 5854713-100, REVISION 2 VENUE FIT™  SERVICE MANUAL
Chapter 8 - Replacement Procedures  8-55
PRELIMINARY
Section 8-4
Functional Checks to be Performed after Replacement Procedures
8-4-1 General Overview
Table 8-36 below lists the Functional Checks to be performed after each Replacement Procedure. 
For easy reference, these are grouped in accordance with the various categories of Venue Fit™  
replacement parts.
8-4-2 Submitting a Replacement Procedure Report
After performing a Venue Fit™ Replacement Procedure, if all required Functional Checks passed 
successfully, proceed as follows to submit a Debrief Script to the GE Service System:
• Using your pole's Dispatch Tool, enter the following script in the Service Comments when debriefing 
a Service Dispatch:
Venue Fit™ Service Manual, Direction DIRECTION 5854713-100, REVISION 2 - per Tab le 8- 36. 
Equipment passed all required tests and is ready for use.
IMPORTANT - AFTER PERFORMING A REPLACEMENT PROCEDURE, ALWAYS REPORT TO 
THE GE SERVICE SYSTEM, AS DESCRIBED BELOW.