EasyManua.ls Logo

GE Venue Fit - Functional Checks to be Performed after Replacement Procedures; Submitting a Replacement Procedure Report

GE Venue Fit
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DIRECTION 5854713-100, REVISION 2 VENUE FIT™ SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-55
PRELIMINARY
Section 8-4
Functional Checks to be Performed after Replacement Procedures
8-4-1 General Overview
Table 8-36 below lists the Functional Checks to be performed after each Replacement Procedure.
For easy reference, these are grouped in accordance with the various categories of Venue Fit™
replacement parts.
8-4-2 Submitting a Replacement Procedure Report
After performing a Venue Fit™ Replacement Procedure, if all required Functional Checks passed
successfully, proceed as follows to submit a Debrief Script to the GE Service System:
Using your pole's Dispatch Tool, enter the following script in the Service Comments when debriefing
a Service Dispatch:
Venue Fit™ Service Manual, Direction DIRECTION 5854713-100, REVISION 2 - per Tab le 8- 36.
Equipment passed all required tests and is ready for use.
NOTICE
IMPORTANT - AFTER PERFORMING A REPLACEMENT PROCEDURE, ALWAYS REPORT TO
THE GE SERVICE SYSTEM, AS DESCRIBED BELOW.

Table of Contents

Related product manuals