EasyManua.ls Logo

GE Venue Fit - AC;DC PSU Replacement Procedure; Tools; Time Required; Preparations

GE Venue Fit
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DIRECTION 5854713-100, REVISION 2 VENUE FIT™ SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-35
PRELIMINARY
8-2-16 AC/DC PSU Replacement Procedure
8-2-16-1 Tools
N/A
8-2-16-2 Time Required
3min
8-2-16-3 Preparations
1.) Shut down the Venue Fit™ ultrasound unit, as described in Power Shutdown.
2.) While facing the rear side of the cart, Lock all cart casters.
3.) Disconnect the power cable from the wall out let and from the back side of the cart.
8-2-16-4
PSU Removal Procedure
4.) Disconnect the power cable from the rear side of the system.
5.) Route the power cable out of the tilt cable holder.
6.) Slide upwards the left cart cable guide.
Figure 8-59 Remove Cart Left cable guide
7.) using your thumb and pointing finger, remove the AC/DC PSU cover by a pinching both sides of the
cover and pulling it towards you.
Figure 8-60 Remove Power Supply Cover

Table of Contents

Related product manuals