EasyManua.ls Logo

GE Venue Fit - Kickstand Installation Procedure; Tools; Time Required; Preparations

GE Venue Fit
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DIRECTION 5854713-100, REVISION 2 VENUE FIT™ SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-5
PRELIMINARY
8-2-3 Kickstand Installation Procedure
8-2-3-1 Tools
Phillips screwdriver of appropriate size.
8-2-3-2 Time Required
5 min
8-2-3-3 Preparations
1.) Shut down the Venue Fit™ ultrasound unit, as described in Power Shutdown.
2.) Prepare stable flat surface covered with a soft material (such as foam or thick cloth) to prevent
scratches to the display.
3.) Dismount Venue Fit™ system from cart as described in Mounting / Dismounting System on Cart
and place it on a previously prepared surface with the display facing down.
8-2-3-4 Kickstand Installation Procedure
1) Remove the hinges rubber caps by pushing them to the sides and dispose them.
Figure 8-33 Rubber caps removal
2) Align the kickstand below the hinges and secure with 2 screws on each side.
Figure 8-34 Kickstand installation

Table of Contents

Related product manuals