EasyManua.ls Logo

GE Venue Fit - Page 75

GE Venue Fit
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DIRECTION 5854713-100, REVISION 2
VENUE FIT™ SERVICE MANUAL
Chapter 3 - System Setup 3-3
PRELIMINARY
NOTE: The Venue Fit™ User Manual should be fully read and understood before operating the unit.
Keep the manual near the unit for reference.
WARNINGWARNING
TWO PEOPLE ARE REQUIRED TO UNPACK THE SYSTEM CART AS IT IS HEAVY.
TWO PEOPLE ARE ALWAYS REQUIRED WHENEVER A PART WEIGHING 16KG (35 LB.)
OR MORE MUST BE LIFTED.
CAUTION
IF THE UNIT IS VERY COLD OR HOT, DO NOT TURN ON POWER TO THE UNIT UNTIL IT HAS
HAD SUFFICIENT TIME TO ACCLIMATE TO ITS OPERATING ENVIRONMENT.
CAUTION
TO PREVENT ELECTRICAL SHOCK, CONNECT THE UNIT TO A PROPERLY GROUNDED
POWER OUTLET.
DO NOT USE A THREE-PRONG TO TWO-PRONG ADAPTER, AS THIS DEFEATS SAFETY
GROUNDING.
CAUTION
DO NOT WEAR THE ESD WRIST STRAP WHEN YOU WORK ON LIVE CIRCUITS WHERE MORE
THAN 30 V PEAK IS PRESENT.
CAUTION
DO NOT OPERATE THE UNIT UNLESS ALL BOARD COVERS AND FRAME PANELS ARE
SECURELY IN PLACE, TO ENSURE OPTIMAL SYSTEM PERFORMANCE AND COOLING.
(WHEN COVERS ARE REMOVED, EMI MAY BE PRESENT).
WARNINGWARNING
ACOUSTIC OUTPUT HAZARD
ALTHOUGH THE ULTRASOUND ENERGY TRANSMITTED FROM THE Venue Fit™
PORTABLE ULTRASOUND SCANNER IS WITHIN AIUM/NEMA STANDARDS AND FDA
LIMITATIONS, AVOID UNNECESSARY EXPOSURE. ULTRASOUND ENERGY CAN
PRODUCE HEAT AND MECHANICAL DAMAGE
.

Table of Contents

Related product manuals