Maintenance Manual April 2018
Programmed Maintenance Procedures
132 S
®
Booms • Z
®
Booms Part No. 1268489GT
P0-4
Continental Engine Maintenance – Under 1000 Hours
Additional engine maintenance is required. Refer to the Programmed Maintenance Inspection Report for
the specific intervals that apply.
Required maintenance procedures and additional engine information are available in the manufacturer's
manuals. Refer to Specifications, Engine Operator and Maintenance Manuals.
Continental TME27
Hour Intervals
Procedure
∅ =
Not required
Daily 50 100 250 500
Visual inspection of engine
Oil level - check
Air cleaner - check
PCV system - check
Coolant level - check
Oil, fuel and coolant systems - check for leaks
Air filter discharge valve - clean
Fan belt tension - check
Battery - check
Engine oil - replace
Oil filter - replace
Harness connections - check
Cooling system - check
Air filter - replace
PCV valve - check
Valve tappet clearance - adjust
Fuel system - check
Fuel pump - check
Fuel filter - replace

Table of Contents

Other manuals for Genie Z Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Genie Z Series and is the answer not in the manual?

Genie Z Series Specifications

General IconGeneral
Lift Capacity500 lb (227 kg) to 660 lb (300 kg)
Gradeability30%
Power SourceDiesel, Electric
Capacity500 lb (227 kg) to 1, 000 lb (454 kg)
Drive System4-wheel drive
Tire TypeSolid
Steering2-wheel or 4-wheel