Commissioning
process
Without an
y
power applied to the panel:
1. Verif
y
the continuit
y
of the loop circuit wirin
g
,
The cable resistance should be 13ohms max. at 1Km.
DO NOT UNDERTAKE HIGH VOLTAGE TESTS WITH WIRING
CONNECTED TO THE LOOP DEVICES, SUCH AS TO THE BASE.
2. Verif
y
the continuit
y
of the sounder circuit wirin
g
.
With circuit connected the 10Kohms end-of-line
resistance can be measured.
Connect the mains and batter
y
suppl
y
to th e
panel and once powered up:
1. Carr
y
out a Displa
y
test accessible at access level 2
and check all the indicators are workin
g
.
2. Setup the s
y
stem clock, accessible at access level 3.
3. Carr
y
out temporar
y
disconnection and re-connection
of batter
y
, mains suppl
y
and sounder circuits
and check fault indications are
g
iven of disconnections.
Connect the loop circuit:
1. Check the address allocation with onl
y
loop end-1 connected,
note a loop open circuit fault is displa
y
ed.
Repeat the test with onl
y
loop end-2 connected and then
with both ends connected.
2. Carr
y
out open circuit and short circuit tests on the +ve and -ve lines
of the loop circuit, re-allocate the loop after each test.
3. Re allocate the loop, confi
g
ure the Hardware link to allow data
to be saved at the panel and save the loop map data to the
panel EEPROM.
Confi
g
uration:
1. Assi
g
n devices to zones
2. Label devices and zones.
3. Connect, confi
g
ure and test other equipment
connected to the panel.
4. On completion of chan
g
es to confi
g
uration data and with
data saved to the EEPROM, reset the hardware
link to position 2-3 to write protect the EEPROM.
Fire plan:
1. Test the fire plan.
2. Check alarm sound levels in all areas of the buildin
g
(s).
Handover:
1. Ensure all interested parties are informed the fire alarm
s
y
stem is active.
2. Fill in the lo
g
book and provide advise on user responsibilit
y
and the need to maintain the s
y
stem in accordance with BS5839:Part 1.