EasyManua.ls Logo

Guldmann GH2 - Taking down Hoist and Travelling Trolleys

Guldmann GH2
109 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Guldmann GB-1394/11/08
54
3. InstallatIon
Rail systems should be installed in such a way as to
make it possible to take down hoists and traverse
travelling trolleys so that they can be serviced.
This is particularly the case in connection with systems
that are built into ceilings so that it is impossible to remove
brackets.
Rails with milled grooves for removing the hoist are
available.
To remove the transverse travelling trolley from the rail
there must be at least 60 mm (2
3
/
8
") of space from the
track end to the wall on the end where the charging pick-
up is fitted.
As an alternative, the rail can be cut at an angle of
45° – 60 mm x 60 mm (2
3
/
8
" x 2
3
/
8
").
NB!
Rails with milled grooves, rails at a distance of 60 mm
(2
3
/
8
") from the wall, or rails cut off at 45° must be placed
at the same end as the charging pick-up on the traverse
travelling trolley.
Taking down hoists and travelling trolleys

Table of Contents

Other manuals for Guldmann GH2

Related product manuals