91
5. control
Checkliste
1. Control of any reinforcements, gear
check that the reinforcement/gearing is securely
fastened
that isolation surrounding the reinforcement/gearing is
placed to ensure the greatest possible isolation
the reinforcement/gearing has been carried out by
another contractor
see comments
2. Control of brackets and plastic plugs
that all end stops are tightened
that all fittings are tightened
that plastic stoppers are fitted on all visible nuts.
that locking pin is in place and locks the end stop
see notes
3. Check that the rail systems are clean
and fully functional
that there are no chips or other building waste inside the
rail system
that the travelling trolley moves silently in the rail system
that the travelling trolley moves with a low power
consumption
see comments
4. Control of switch tracks, Combi-lock
and turntable (if fitted)
that the switch track is fully functional and that the
tongue does not touch other components
that the Combi-lock is fully functional and that the
spring retracts automatically
that there is no dust or foreign bodies in the rails with
safety locks. Clean with compressed air, if necessary
– after the building, rebuilding etc. is finished.
that the turntable is fully functional
5. Weight test
the rail system has been tested for ________ kg
(incl. a safety factor of 1.5)
that the rail system did not give during the weight test
that the rail system is still level following weight testing
that the rail system has been labelled with a completed
installer’s label
see comments
6. Test of ceiling hoist and drive motor
that the ceiling hoist has been tested and is fully
functional
that the drive motor has been tested and is fully
functional
the emergency lowering cord should be cut off so
that it is 1.9 m/6’3” above the floor.
see comments
7. Test of charging station, charging liners
and remote control (if used)
that the ceiling hoist charges when the ceiling hoist is
placed in the charging station (light or sound signal)
that the ceiling hoist is charged in the charging liners
that the remote control has been tested and is fully
functional
see comments
8. Before leaving the assembly site
collect or remove all installation waste
if there are comments, write these down and inform
the owner/customer
see comments
Comments:
The quality control has been prepared in two signed
copies, one of which is submitted to the owner/customer,
the other to the service and installation department at
Guldmann.
For V. Guldmann A/S
Quality control on handover of the rail system
Case/address: Order no.
System scope: Serial no.
Distributor:
Installer Date: /
Supplier: V. Guldmann A/S · Graham Bells Vej 21-23a · 8200 Århus N · Denmark

Table of Contents

Other manuals for Guldmann GH2

Related product manuals