059305–00 REV. E
HEAT-TIMER CORP.
|
33
04 INSTALLATION INSTRUCTIONS
COMPLETING THE WIRING
1 After all wiring to the ETV Platinum Plus is complete, apply power to the ETV Platinum Plus and
all Actuators.
2 Do not re-install the Enclosure wire cover at this point as access to the PROGRAM/RUN switch is
needed for programing of the module.
3 With power supplied to the ETV Platinum Plus, the power loss capacitor of the actuator if applicable
requires about 2 minutes to fully charge.
FIGURE 13
LOCATION OF THE ACTUATOR DIP
SWITCHES AND CAPACITOR JUMPER
CAPACITOR JUMPER
ACTUATOR DIP SWITCHES