EasyManua.ls Logo

Hitachi UTOPIA IVX STANDARD Series - Page 21

Hitachi UTOPIA IVX STANDARD Series
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
b. For the downward piping
Gas piping
Knock-out hole
Bottom base
Cables
Liquid piping
? NOTE
Cablesshallnotcontactdirectlytothepipes.
c. For the rear side piping
Rear Cover
? NOTE
Removethe rearpipe cover under the rearcover and remove
partfollowingtheslit.
2 Mount the piping cover in order to avoid water entering into
the unit. Seal the holes where pipes and wires are inserted,
by using a insulation (eld-supplied).
3 If the eld-supplied piping is connected with stop valves
directly, it is recommended use a tube bender.
4 Check to ensure that the stop valves are closed completely
before connecting pipes.
5 Connect the eld supplied refrigerant pipes to the indoor unit
and outdoor unit. Apply the oil thinly at the seat are nut and
pipe before tightening.
6 After connecting the refrigerant piping, seal the open space
between knockout hole and refrigerant pipes by using
insulation material.
7 Operation of stop valve should be performed according to
the gure below.
Outdoor unit stop valve
Spindle Type
Spindle valve
Flare nut
Cap
Check joint for service port
Closed upon factory shipping
Tightening Torque (Nm)
Liquid valve 7-9 33-42
33-42 14-18
Gas valve 9-11 68-82
Spindle Type
Description Remarks
Cap
Allen wrench Hex 4 mm
Refrigerant Piping Field Supplied
Flare nut
Refrigerant
Pressure
To Outdoor Unit
Seat Surface Fully closed position
Check Joint
Only the charging those can be
connected
Charge port cap
O-Ring Rubber
Spindle valve
Open – Counterclockwise
Close – Clockwise
Do not apply two
spanners at this
position. If applied,
leakage will occur
Stop valve
(Spindle type)
Flare nut
REFRIGERANT PIPING & REFRIGERANT CHARGE
PMML0395B rev.0 - 11/2015
11

Table of Contents

Related product manuals