EasyManua.ls Logo

Huawei BTS3900L - Page 48

Huawei BTS3900L
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 8-16 Positions of the access holes in the support and holes in the ESD floor
(1) Mounting holes for the ESD floor (2) ESD floor (3) Mounting hole for the concrete floor
2. Mark the positions of the mounting holes on the concrete floor, as shown in Figure 8-17.
Figure 8-17 Marking the positions of the mounting holes
(1) Mounting hole for the
concrete floor
(2) Concrete floor
BTS3900L (Ver.C)
Installation Guide
8 Installing the Cabinet
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
39

Table of Contents

Related product manuals