EasyManua.ls Logo

Huawei FusionModule800

Huawei FusionModule800
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
2 Installation Preparations
Copyright © Huawei Technologies Co., Ltd.
25
Units
1 MPa ≈ 10 bar
1 MPa ≈ 145 psi
1 MPa ≈ 10.2 kgf/cm
2
2.6 Personnel Requirements
Only trained and qualified personnel who fully understand basic safety precautions are
allowed to install and operate a modular data center.
Huawei will not be liable for any consequence caused by the violation of this document.
The requirements are as follows:
Customers' installation personnel must be trained by Huawei and understand how to
install and operate a modular data center.
The number of installation personnel varies based on the project progress and installation
environment. Typically, two to three persons are required.

Table of Contents

Other manuals for Huawei FusionModule800

Related product manuals