3 Hardware Installation
Copyright © Huawei Technologies Co., Ltd.
80
Figure 3-58 Bottom pipe routing inside the Converged Cabinet
(Optional for installing a third smart cooling product) Laying out pipes inside the IT
cabinet
Figure 3-59 shows the pipe layout.