iManager NetEco 6000
Device Installation and Commissioning Guide
Copyright © Huawei Technologies Co., Ltd.
Step 2 Choose Monitoring > MUE05A Expansion Card > MUE05A4 > Running Parameter >
AI/DI_1 Port Settings.
Step 3 Select Enable for AI/DI_1 Sensor.
Step 4 Click Submit, as shown in Figure 6-53.
Figure 6-53 Setting port enabling of a dry contact
Step 5 Select Door Sensor for AI/DI_1 Sensor Type from the drop-down list, as shown in Figure
6-54.
Figure 6-54 Setting the sensor type of a dry contact
Step 6 Set AI/DI_1 Power Supply to On.
Step 7 Click Submit.
----End