EasyManua.ls Logo

Inficon 3000 Micro GC - Installation Instructions for the Pressure Reducer

Inficon 3000 Micro GC
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 - 9
PN 074-519-P1C
3000 Micro GC Operating Manual
5.1.4.3 Installation Instructions for the Pressure Reducer
1 Turn off 3000 Micro GC and allow the sample inlet fitting to cool.
WARNING
3000 Micro GC has inlets which can be heated to 140°C.
Touching the inlets at operating temperatures can result
in injury. Extreme care should be taken to avoid touching
the heated inlets.
2 Move the 3000 Micro GC handle fully away from the front cover.
3 Remove any fittings or hardware currently installed on the 3000 Micro GC
sample fitting.
NOTE: The external 10 micron sample inlet filter may be left in place. Refer to
section 5.1.2 on page 5-3.
4 Loosely install a 5/16 in. female nut, back ferrule, and front ferrule onto the
sample inlet fitting or the 10 micron sample inlet filter. See Figure 5-9. Do not
tighten. The outlet tube will be installed into this fitting later.
Figure 5-9 Installing ferrules
5 Insert the outlet tube into the top 1/16 in. fitting on the flow controller (see Figure
5-10). Tighten 1/2 turn past finger tight using the 1/4 in. open-ended wrench,
then loosen 1/4 turn, so that the tube is loose but will not disengage.
Figure 5-10 Installing the sample outlet tube
Back ferrule
Front ferrule
5/16 in. female nut
Sample in
Vent out
Install outlet
tube here

Table of Contents

Other manuals for Inficon 3000 Micro GC

Related product manuals