EasyManua.ls Logo

Inficon 3000 Micro GC - Mounting the Heated Sample Conditioners

Inficon 3000 Micro GC
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 - 24
PN 074-519-P1C
3000 Micro GC Operating Manual
5.1.6.3.5 Mounting the Heated Sample Conditioners
1 Add female nut, front ferrules and back ferrules to the transfer line as shown in
Figure 5-29.
Figure 5-29 Installing female nut, back, and front ferrules onto transfer line
Figure 5-30 Accessory with copper coil and nut installed
2 Hold the heated sample introduction accessory at an angle to the instrument
and slide the right side screw slots under the loosened 3000 Micro GC cover
screws. See Figure 5-31 and Figure 5-32.
Figure 5-31 Installing the mounting plate onto the 3000 Micro GC
(2-Channel 3000 Micro GC shown, top view)
Female nut
Accessory
sample outlet
Transfer line
Copper coil
1/16 in. back ferrule
3000 Micro GC
sample inlet
1/16 in. front ferrule
Copper coil and
nut installed
3000 Micro GC
Loosen
screws

Table of Contents

Other manuals for Inficon 3000 Micro GC

Related product manuals