EasyManua.ls Logo

JLG E450A - Boom Synchronizing Procedure; Foot Switch Adjustment

JLG E450A
480 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 4 - BOOM & PLATFORM
3121714 4-13
3. Align bottom tubes with attach holes in rotator support.
Using a soft head mallet, install rotator support pin #5
into articulating jib boom and secure with mounting
hardware.
4. Align articulating jib boom with attach hole in articulat-
ing jib boom pivot weldment. Using a soft head mallet,
install rotator support pin #4 into articulating jib boom
and secure with mounting hardware.
5. Align bottom tubes with attach holes in articulating jib
boom pivot weldment. Using a soft head mallet, install
rotator support pin #3 into articulating jib boom pivot
weldment and secure with mounting hardware.
6. Align articulating jib boom pivot weldment with attach
holes in fly boom assembly. Using a soft head mallet,
install pivot pin #2 into fly boom assembly and secure
with mounting hardware.
7. Align the slave leveling cylinder with attach holes in
articulating jib boom pivot weldment. Using a soft head
mallet, install slave leveling cylinder pin #1 into articu-
lating jib boom pivot weldment and secure with mount-
ing hardware.
4.9 BOOM SYNCHRONIZING PROCEDURE
NOTE: If the Lower Boom assembly does not fully lower:
1. Remove all personnel from the platform.
2. Pull the red knob located under the main control valve.
3. From Ground Control, activate the lift control switch,
raise Lower Boom 6 ft. (1.8m).
4. After raising Lower Boom, release the red knob.
5. Activate Lower Boom Down, fully lower boom.
6. Repeat step 1 through 5 if necessary.
4.10 FOOT SWITCH ADJUSTMENT
Adjust switch so that functions will operate when pedal is at
center of travel. If switch operates within last 1/4 inch (6.35
mm) of travel, top or bottom, it should be adjusted.

Table of Contents

Other manuals for JLG E450A

Related product manuals