APPENDIX B - RIGGING ILLUSTRATIONS
FORM 155.17-N1
ISSUE DATE: 4/1/2013
NOTE: For lifting units, sling vertically. Use extreme care so as not to sling against, or on any projecting brackets, pipes, ttings, etc. Use four
slings, one on each end of the high-temperature generator and one at each end of the main shell. When lifting, keep unit level.
FIGURE 45 - RIGGING FOR 16G THROUGH 18G DIRECT-FIRED UNITS
LD05333
NOTE: For lifting units, sling vertically. Use extreme care so as not to sling against, or on any projecting brackets, pipes, ttings, etc. Use four
slings and spreader bar as shown, one sling on each end of the rst-stage generator and one on each end of the main shell.
FIGURE 46 - RIGGING FOR 19G THROUGH 19GL DIRECT-FIRED UNITS