Table 9: Site Preparation Checklist (continued)
DatePerformed byFor More InformationItem or Task
“MX150 Router Overview” on page 3Choose the number of devices you want to
install.
Rack or Cabinet
“Rack Requirements for an MX150”
on page 23
“CabinetRequirementsfor an MX150”
on page 24
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the device.
“Clearance Requirements for Airflow
and Hardware Maintenance for an
MX150” on page 25
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Desk
“Requirements for Mounting an
MX150 on a Desktop or Other Level
Surface” on page 23
Verify that the desk meets the minimum
requirements for the installation of the device.
“Clearance Requirements for Airflow
and Hardware Maintenance for an
MX150” on page 25
Verify that there is appropriate clearance in your
selected location.
Wall
“Clearance Requirements for Airflow
and Hardware Maintenance for an
MX150” on page 25
Verify that there is appropriate clearance in your
selected location.
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed for
each cable. Choose the lengthof cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related
Documentation
General Safety Guidelines and Warnings on page 121•
• General Site Guidelines on page 21
• Installing and Connecting an MX150 on page 77
• Mounting an MX150 on page 78