CHAPTER 5
Preparation Overview
•
Site Preparation Checklist for MX150 on page 19
•
Environmental Requirements and Specifications for an MX150 on page 21
•
General Site Guidelines on page 21
•
Site Electrical Wiring Guidelines on page 22
•
Requirements for Mounting an MX150 on a Desktop or Other Level Surface on page 23
•
Rack Requirements for an MX150 on page 23
•
Cabinet Requirements for an MX150 on page 24
•
Clearance Requirements for Airflow and Hardware Maintenance for an
MX150 on page 25
Site Preparation Checklist for MX150
The checklist in Table 9 on page 19 summarizes the tasks you need to perform when
preparing a site for MX150 router installation.
Table 9: Site Preparation Checklist
DatePerformed byFor More InformationItem or Task
Environment
“Environmental Requirements and
Specifications for an MX150” on
page 21
Verify that environmental factors such as
temperatureandhumidity do not exceed device
tolerances.
Power
Measure distance between external power
sources and device installation site.
Locate sites for connection of system
grounding.
“AC Power Supply Specifications for
an MX150” on page 27
Calculate the power consumption and
requirements.
Hardware Configuration
19Copyright © 2017, Juniper Networks, Inc.