EasyManua.ls Logo

Juniper SRX4100 - Site Preparation Checklist for the SRX4100 Services Gateway; Table 14: Site Preparation Checklist for SRX4100 Services Gateway

Juniper SRX4100
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
to interfaces that connect to the OSP or its wiring. The intrabuilding port(s)
of the device is suitable for connection to intrabuilding or unexposed wiring
or cabling only. The addition of primary protectors is not sufficient protection
to connect these interfaces metallically to OSP wiring.
Related
Documentation
General Site Installation Guidelines on page 20
Site Preparation Checklist for the SRX4100 Services Gateway
Table 14 on page 22 provides a checklist of tasks you need to perform when preparing a
site for installing the SRX4100 Services Gateway.
Table 14: Site Preparation Checklist for SRX4100 Services Gateway
Installation
NotesDate
Performed
ByAdditionalInformationItem or Task
Power
Measure distance between external
power sources and device
installation site.
Locate sites for connection of system
grounding.
AC Power Supply
Specifications for
SRX4100 Services
Gateways” on page 29
“DC Power Supply
Specifications for
SRX4100 Services
Gateways” on page 31
Calculate the power consumption
and requirements.
Environment
“SRX4100 Services
Gateway Environmental
Specifications” on
page 20
Verify that environmental factors
such as temperature and humidity
do not exceed device tolerances.
Rack or Cabinet
Copyright © 2017, Juniper Networks, Inc.22
SRX4100 Services Gateway Hardware Guide

Table of Contents

Other manuals for Juniper SRX4100

Related product manuals