Table 14: Site Preparation Checklist for SRX4100 Services Gateway
Installation (continued)
NotesDate
Performed
ByAdditionalInformationItem or Task
“SRX4100 Services
Gateway Rack
Requirements” on
page 23
“Cabinet Requirements
for SRX4100 Services
Gateways” on page 24
Verify that your rack or cabinet meets
the minimum requirements for the
installation of the device.
Plan rack location, including required
space clearances.
Secure the rack or cabinet to the floor
and building structure.
Cables
Acquire cables and connectors:
•
Determine the number of cables
needed based on your planned
configuration.
•
Review the maximum distance
allowed for each cable. Choose
the length of cable based on the
distance between the hardware
components being connected.
Plan the cable routing and
management.
Related
Documentation
SRX4100 Services Gateway Installation Overview on page 41•
SRX4100 Services Gateway Rack Requirements
The SRX4100 Services Gateway is designed to be installed on four-post racks.
Table 15 on page 24 provides the rack requirements and specifications for the services
gateway.