2.8.1 Ferrite Ring Installation
Installation
The ferrite rings are to be installed on the motor wires as close to the
inverter as possible.
Take the ferrite(s) and pass all three motor phases through the center. Use
a wire tie to secure the ferrite(s) to the wire. Note: Do not pass the earth
ground wire through the ferrite(s). Connect the motor wires to the U,
V, and W terminals on the inverter using the specied terminal tightening
torque. When using shielded motor cable, the ferrites are installed on an
unshielded section of the cable before the shielding begins. Terminate the
shield of the cable either to the inverter or directly to the bare metal sub
panel in the control cabinet.

Table of Contents

Other manuals for KEB COMBIVERT F5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KEB COMBIVERT F5 and is the answer not in the manual?

KEB COMBIVERT F5 Specifications

General IconGeneral
CategoryDC Drives
Enclosure RatingIP20
Control ModeVector Control, V/f Control
ProtectionOvercurrent, Overvoltage, Undervoltage, Overtemperature, Short circuit
Fieldbus CommunicationPROFIBUS, CANopen
Communication InterfacesRS-485
Input Voltage380-480V AC
Cooling MethodForced air cooling (fan)