EasyManua.ls Logo

Keysight ENA Series - 2 Performance Tests; Introduction

Keysight ENA Series
217 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Keysight E5092A ENA Series Configurable Multiport Test Set
Service Guide
2 Performance Tests
This chapter provides information on how to verify the E5092A performance.
Introduction
This literature provides the performance test procedures for the Keysight
E5092A. The performance test names are listed in Table 2-1. The test
procedures are described sequentially in the following pages.
The test name indicates the tested performance and to which performance
group the tested performance belongs.
Each procedure consists of the following parts:
Description: describes the test procedure.
Specification: describes the performance verified in the test.
Test Equipment: describes test equipment required in the test.
Procedure: describes the test procedure step by step.
Allow the E5092A to warm up for at least 90 minutes before you execute
any of the performance tests.
Perform all performance tests in an ambient temperature of 23 ± 5 °C
Before performing any tests, make extra copies of the performance test
record pertaining to the test procedure. These are required in the test
procedure. For explanation of how to use these records, see the
performance test record at the end of this literature.

Table of Contents

Other manuals for Keysight ENA Series

Related product manuals