EasyManua.ls Logo

Keysight ENA Series - 6 Post-Repair Procedures; Post-Repair Procedures

Keysight ENA Series
217 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
205
Keysight E5092A ENA Series Configurable Multiport Test Set
Service Guide
6 Post-Repair Procedures
This chapter lists the procedures required to verify the E5092A operation after
an assembly is replaced with a new one.
Post-Repair Procedures
Table 6-1 Post Repair Procedures lists the required procedures that must be
performed after the replacement of an assembly. These are the recommended
minimum procedures to ensure that the replacement is successfully
completed.
Table 6-1 Post-Repair Procedures
Replaced
Assembly or Part
Required
Adjustments
Correction Constants
(CC)
Verification
Switch Control USB
PCA (E5092-66601)
No adjustment
needed
Perform the following performance tests.
- Write SN
- DC Source Output Voltage Accuracy
Test
- DC Source Maximum Current Test
- Control Line Maximum Current Test
- LED Check
- DCBUS Check

Table of Contents

Other manuals for Keysight ENA Series

Related product manuals