EasyManua.ls Logo

Keysight ENA Series - Page 206

Keysight ENA Series
217 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
206 Keysight E5092A ENA Series Configurable Multiport Test Set
Post-Repair Procedures
Post-Repair Procedures
6-
Switch Indicator LED
PCA (E5092-66602)
No adjustment
needed
Perform the following performance tests.
- Write SN
- DC Source Output Voltage Accuracy
Test
- DC Source Maximum Current Test
- Control Line Maximum Current Test
- LED Check
- DCBUS Check
DUT Control PCA
(E5092-66603)
No adjustment
needed
Perform the following performance tests.
- Write SN
- DC Source Output Voltage Accuracy
Test
- DC Source Maximum Current Test
- Control Line Maximum Current Test
- LED Check
- DCBUS Check
Switch 5 (SPDT
Switch Bias Pin
Adapter PCA)
(E5092-66504)
No adjustment
needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and
Isolation Test for Switch 5 (SPDT, 5COM,
5A and 5B)
- LED Check
- DCBUS Check
Switch 6 (SPDT
Switch Bias Pin
Adapter PCA)
(E5092-66504)
No adjustment
needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and
Isolation Test for Switch 6 (SPDT, 6COM,
6A and 6B)
- LED Check
- DCBUS Check
Table 6-1 Post-Repair Procedures
Replaced
Assembly or Part
Required
Adjustments
Correction Constants
(CC)
Verification

Table of Contents

Other manuals for Keysight ENA Series

Related product manuals