206 Keysight E5092A ENA Series Configurable Multiport Test Set
Post-Repair Procedures
Post-Repair Procedures
6-
Switch Indicator LED
PCA (E5092-66602)
No adjustment
needed
Perform the following performance tests.
- Write SN
- DC Source Output Voltage Accuracy
Test
- DC Source Maximum Current Test
- Control Line Maximum Current Test
- LED Check
- DCBUS Check
DUT Control PCA
(E5092-66603)
No adjustment
needed
Perform the following performance tests.
- Write SN
- DC Source Output Voltage Accuracy
Test
- DC Source Maximum Current Test
- Control Line Maximum Current Test
- LED Check
- DCBUS Check
Switch 5 (SPDT
Switch Bias Pin
Adapter PCA)
(E5092-66504)
No adjustment
needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and
Isolation Test for Switch 5 (SPDT, 5COM,
5A and 5B)
- LED Check
- DCBUS Check
Switch 6 (SPDT
Switch Bias Pin
Adapter PCA)
(E5092-66504)
No adjustment
needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and
Isolation Test for Switch 6 (SPDT, 6COM,
6A and 6B)
- LED Check
- DCBUS Check
Table 6-1 Post-Repair Procedures
Replaced
Assembly or Part
Required
Adjustments
Correction Constants
(CC)
Verification