79
PROCEDURE
Operating Procedure Operation Display
⑴ Observe the starting position and target
following the steps 1 to 3 in “PROCEDURE
13.1.1 Measuring the distance between multiple
targets.”
MLM S 46.755%
H 37.345 m
3
V 1.060 m
S 15.483 m
HAR 135°31′28″
MLM MOVE S/% OBS
⑵ Press MOVE with the “Missing Line
Measurement Results Screen” displayed.
Press MOVE to change the last measured point
to the starting point.
MOVE
Move ?
S 15.483 m
ZA 70°24′18″
HAR 135°31′28″
NO YES
⑶ Press YES, the last target measured becomes
the new starting position. Refer to “13.1.1
Measuring the Distance Between Multiple
Targets”, perform missing line measurement of
the next target point.
YES
MLM
S 15.483 m
ZA 70°24′18″
HAR 135°31′28″
MLM MOVE S/% OBS
14. REM MEASUREMENT
· An REM measurement is a function used to measure the height to a point where a target can not be
directly installed, for example a power cable, bridge, etc.