EasyManuals Logo

Lauda E 4 G User Manual

Lauda E 4 G
119 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
ECO GOLD
25/08/2011/ YACE0088 Before putting the device into operation 27
Turn the pump output downwards for external bath circulation.
Fit the hose section of the pump connection set onto the outflow
elbow and place the pump connections in the position of the re-
moved blind flange.
Push the holed flange under the pump connections and fasten it
with two cross-head screws to the underside of the control head.
Holed flange
Use the flat seal. Make sure the seal is in the correct position. On
one side of the seal there are two steps
:
They must be positioned on the side of the display.
Refit the control head onto the bath bridge with the two cross-head
screws.
Select the division of the pump flow to suit the thermostating task
using the selector switch on the front of the control head.
The position
EXT gives the greatest flow in the external circuit.
With the position INT the external flow is throttled to a minimum and
the outlet for the internal bath circulation is fully opened.
With positions between INT and EXT the flow is divided up between
internal and external circulation.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lauda E 4 G and is the answer not in the manual?

Lauda E 4 G Specifications

General IconGeneral
BrandLauda
ModelE 4 G
CategoryThermostat
LanguageEnglish

Related product manuals