Leerjet 35/36 Developed for Training Purposes 2B-65
December 1998
Expanded Normal Procedures
Prolonged Storage (31 Days to 6 Months)
Aircraft . . . . . . . . . . . . . . . . . . . . . . . .WASHED AND WAXED
Interior
Interior. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CLEANED
Seat Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . INSTALLED
Install protective seat covers on all seats.
Parking Procedure. . . . . . . . . . . . . . . . . . . . . . PERFORMED
Perform parking procedure as described for Flyable Stor-
age.
Engines
Engines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PRESERVED
Preserve engines in accordance with “Engine Preservation
Instructions (Six Months or Less)” in the TFE731-2-2B
Engine Light Maintenance Manual. When preserving
engines, follow the special environmental preservation
instructions, if applicable.
Protective Covers . . . . . . . . . . . . . . . . . . . . . . . . INSTALLED
Fuel System
Fuel System Procedure . . . . . . . . . . . . . . . . . PERFORMED
Perform fuel system procedure as described for Flyable
Storage.
Fuel Vents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COVERED
Cover fuel vents with barrier material and secure with tape.
Make a 0.10 inch diameter hole in barrier material to allow
venting.
Electrical System
Batteries . . . . . . . . . . . . . . . . . . . . . . REMOVE AND STORE
Standby Battery. . . . . . . . . . . . . . . . . REMOVE AND STORE
Emer. Power Supply Battery . . . . . . . REMOVE AND STORE